Connect with us

Hi, what are you looking for?

Public Notice

6 Things you need to know before applying for a meter service from ECG

6 Things you need to know before applying for a meter service from ECG

Applying for a meter service should not be stressful. Some customers are not aware of the procedure, processes and cost when they are in need of a meter service. Here are six things you need to know before you apply for a meter service from ECG:


1. Meters are not sold but come with a service charge
Contrary to the perception held by most of our customers, meters are not for sale. Customers only make a one-time contribution towards its installation and maintenance. The amount paid at the time of applying for a service does not include the cost of the meter. Depending on the type of service being applied for, a customer could make some capital contribution towards the materials used in drawing service e.g. Conductors, poles and accessories.
 
 
2. A wiring installation completion certificate is required to apply for a meter service
The wiring of every household must be approved by a representative (agent) of the Energy Commission by providing you with a certified Installation Completion Certificate which comes at a fee. This certificate is part of the requirements when applying for any of our meter services. The Energy Commission is mandated by law to regulate household wiring in the Country. Do not worry if you do not know any representative of the Energy Commission in your area, visit the ECG district that serves your area for information on the agent of the Energy Commission in your area.


3. A copy of your site plan is needed for a new service
When applying for a new service connection (when there is no existing meter in the house e.g. a new building), you will need to provide the original and photocopy of your site plan, original and photocopy of a valid national identity card, your name, address and telephone contact. In the case of applying for a separate meter, you will provide your name, location address, contact telephone number, and a fully paid current receipt of the mother meter you are separating your load from. The original copies you present will be returned after inspection.


4. Do not use the services of middlemen or agents
When applying for a service, do not use the services of any middlemen or agents to avoid disappointment and unnecessary high costs. Visit the ECG District office or the ECG Customer Service Center that serves the area to apply. The Customer Relations Assistant (CRA) will help you go through a very easy and simple application process. A quotation will be given to you after an inspection of your site has been carried out. The quotation given will provide service connection fee up to a maximum of two poles depending on where the last pole to your house has been installed.  Currently, the Company is not using the sale of application forms. You will need to provide some important information (original and photocopy of any valid ID card, name and telephone contact number and a current fully paid receipt of the mother meter for separate meter application and if it’s a new service connection, an original and photocopy of your site plan) for processing your application. You will be given a service application quotation of GH 10.00 to pay to the Cashier, after which you will be given a receipt for the process to continue. Make all payments relating to your service application to ECG Cashiers only, and insist on a receipt.


5. Various types of service connection are provided by ECG at different rates
After an inspection on your site by our estimator, a customer will qualify for any of our services below depending on the outcome of the inspection:
Straight service: where ECG draws a service line from the nearest ECG pole to the customer’s premises.
Separate Meter: where ECG only installs an additional meter to a customer’s premises that already has ECG service line and energy meter(s)
Additional Load:  where ECG draws two additional lines to the customer’s premises to upgrade an existing single-phase service to a three-phase service. The existing single phase meter is also replaced with a three phase meter.
1 or 2 Pole Extension:  where ECG extends the network with additional pole(s) and conductors and then draws a service line from the pole(s) to the customer’s premises. This service includes the installation of an energy meter.
SHEP (Self Help Electrification Project)/GOG Project: This is similar to a normal straight service connection. It is generally funded by the Government of Ghana and therefore concessionary rates (determined periodically by GOG) apply.
The approved cost for the various types of service connection are provided below for the guidance of prospective customers:

6. Meters are not to be moved from one location to the other
Meters are not to be transferred from one place to the other. A meter is issued for use in a specific location and should NEVER be transferred to another point. All our meters are geo-referenced for easy identification of customers and database collection. So movement from one place to other can result in data loss. It also leaves room for illegalities.
For more information, visit our website www.ecggh.com or you can visit any of our social media handles on Facebook, Twitter or Instagram @ECGghOfficial for help.

Source: ecggh.com

Written By

You May Also Like

Events

Latest top Events in Ghana coming up for this week and beyond. This magazine post features business, education and opportunities events across the country...

Entertainment

Welcome to the comprehensive list of the most sought-after entertainment events in Ghana. This carefully curated selection will ensure you don’t miss out on...

Events

December in Ghana events coming up for the year 2025 and January 2026. Follow our WhatsApp channel for more updates: https://whatsapp.com/channel/0029Va9Mgo705MUgNeZI342p More December 2025...

Entertainment

Odwira Festival 2024 promises a fun atmosphere and the witnessing of splendor of royal processions, traditional drumming, dancing, and a community bound by the...

Top Posts

Accra, Ghana – September 26, 2025 – Foreign Affairs Minister Samuel Okudzeto Ablakwa announced that the United States has lifted visa restrictions imposed in...

Top Posts

Published: September 27, 2025, 07:50 PM GMT | Ghanaonline.net NEW YORK – Ghana’s President John Dramani Mahama delivered a compelling address at the 80th...

Sports

Dalian, China – September 28, 2025, 10:32 AM GMT – In a heart-stopping finale that will go down in Ghanaian football history, the University...

Sports

Ghana’s Black Stars punched their ticket to the 2026 FIFA World Cup on Sunday, edging out Comoros 1-0 at Accra Sports Stadium to finish...

Sports

Dalian, China – The University for Development Studies (UDS) from Ghana is on the brink of making history as they prepare to face Brazil’s...

Top Posts

Accra, Ghana – September 27, 2025 – Ghana has made history by signing a visa-free travel agreement with Antigua and Barbuda, marking a significant...

Copyright © 2025 Ghanaonline.net. Ghanaonline.net is not responsible for the content of external websites.